Since the beginning of our company's operations, we have performed several works for the main company SHP S.A.A. in San Juan De Marcona.

In the last 5 years our company has performed several services such as:

Earth moving

Mining: We performed drilling and blasting work for the extraction of dolomite, which was then sold and transported by land and sea.

Transport of lump ore: We take care of the loading and ground transportation from the raw stockpile to the Iron Ore destination warehouse.

Transfer of Ore Dross:We moved the stock from the plant to the storage yard at the back of the maintenance facilities in San Nicolas.

Bank breaking and slope stabilization services:We carry out the fragmentation of rocks larger than 1.2 meters, reducing them to the size required to enter the crushing plant.

5° pre-cutting drilling service: We perform secondary pre-cutting drilling, in order to improve slope stability and safety.

Extraction service: We started with the adequacy of the access roads to the mine and the clearing fields 56. Inside the mine, we carried out the clearing of loose material

CIVIL WORKS

  • Construction of container office for Shouxin.
  • Environmental conditioning for the hyperbaric chamber facilities “Justo Pastor Health Center” civil association of iron.
  • Construction of 30 housing units for employees and officials in San Juan Shougang Hierro Peru
  • Construction of the San Juan finance building of Shougang Hierro Peru.
  • Perimeter fence of the same in San Juan Shougang Iron Peru.
  • Minor Projects of Shougang Iron Peru SHP Officials Club
  • Expansion of Shougang Hierro Peru’s San Juan Chinese Officers Club.
  • Construction of the new Oxalic Acid and Xanthate Plant Environment in San Nicolas Shougang Hierro Perú.

MECHANICAL WORKS

  • Staker Repair No. 1 011-505 San Nicolas.
  • Removal of metal piles ex San Nicolas pier defense.
  • Repair of bunker oil storage tank 402-013
  • Disassembly of components of blades ph equipment 003-026 / 003-011 003/0016.
  • Repair, manufacture, lubrication and mechanical, electrical and instrumentation maintenance of the new 20,000 m3 desalination plant.

MINE 20 PROJECT

We are currently carrying out a large project to extract materials from mine 20, which has an execution time of approximately 04 years.